Select a Solution
Title Wrap
I Need a Solution
for

StressWave Case Study | Wind Farm

A wind farm experienced a series of generator failures over a short amount of time. Using Curtiss-Wright's StressWave technology, the wind farm found early signs of degradation on a MW class wind turbine generator, resulting an approximately $155k in cost savings.

wind farm case study

 

Get a Solution for