FAMOS
News and Events

2010 Symposium:
Fleet Asset Management and Optomization Solutions
August 17-20, 2010

Call for Presenters

PEPSE Training
September 13-16, 2010

PMAX Training
Watch for the 2010 training schedule.

Scientech papers presented at the EPRI Heat Rate Conference and ASME Power 2009 Conference are now available.

Evaluating an HP/IP Turbine Replacement

Optimizing for the Lowest Cost Electrical Production

Integrated Performance

Midwest Generation selects PdP for fleet wind turbine and fossil plant monitoring. U.S. Utility selects Scientech's PdP advanced pattern recognition software for Fleet monitoring. (See complete story)

The plant tripped during Hurricane Frances and PMAX helped me identify a 10 MWe loss before the plant even started up. I noticed that condenser vacuum was not following the same trend during startup using one of the displays that we developed here. Eventually we determined that the second stage of the liquid ring condenser air removal pump was not primed correctly.”


















PMAX is installed on more nuclear generating stations than all other performance systems combined, PMAX is lending efficiency to over 300 fossil, nuclear, combined cycle and simple cycle units throughout the world.

Both plant operators and engineers benefit from the critical information and readily accessible tools available through the software. Key benefits derived from employing the technology include:

To discover how the FAMOS suite of products can make an impact on your operations, please go to the Contact Us page.